Quality Assurance Project Plan-- Sediment Contaminant Study, Klamath River Sediment Sampling Program
Document Details:
												
Title: Quality Assurance Project Plan-- Sediment Contaminant Study, Klamath River Sediment Sampling Program
Category: Technical Report
File: Reclamation_2010_0120_Quality-Assurance-Project-Plan-Sediment-Contaminant-Study.pdf
Updated Date: 09.01.2017
Author(s)/Source(s): Reclamation
Publication Date: 2010-Aug
Focal Topic: Contaminants, Sediment & Geomorphology, Dam Removal
Location: Klamath Basin
Watershed Code: 180102
											
										Title: Quality Assurance Project Plan-- Sediment Contaminant Study, Klamath River Sediment Sampling Program
Category: Technical Report
File: Reclamation_2010_0120_Quality-Assurance-Project-Plan-Sediment-Contaminant-Study.pdf
Updated Date: 09.01.2017
Author(s)/Source(s): Reclamation
Publication Date: 2010-Aug
Focal Topic: Contaminants, Sediment & Geomorphology, Dam Removal
Location: Klamath Basin
Watershed Code: 180102
																									Abstract:
													
Sediment Contamination
										This Quality Assurance Project Plan documents the sampling design and quality assurance guidelines for the Sediment Contaminant Study, Klamath River Sediment Sampling Program. The study is being undertaken to inform the 2012 Secretarial Decision to either remove or retain four Klamath River dams: JC Boyle, Copco 1, Copco 2 and Iron Gate. In conjunction with toxicity studies, chemical, physical and biological analyses will help determine whether constituents may be present at harmful concentrations. This contaminant investigation will help evaluate the potential for exposing or transporting contaminated sediment should the dams be removed.
Keyword Tags:Sediment Contamination
